The invention relates to the technical field of deployment methods, and provides an ROV rapid deployment method, which adopts an integrated design and automation technology, greatly simplifies the deployment process of an ROV, saves a large amount of time and labor cost, improves the efficiency and progress of offshore construction, reduces errors and risks caused by manual operation, and improves the deployment efficiency of the ROV. The method comprises the following steps that firstly, ROV related components are integrated, and all interfaces among the ROV related components, a control system optical fiber communication interface and an optical fiber communication interface of a cable shaft control box are connected in advance for communication; a high-voltage power supply interface of a control system is connected with a power supply interface of a cable shaft control box to supply power to an ROV body, an umbilical cable of an electric cable shaft penetrates through a hole in the middle of a load-bearing head of the ROV body and is fixedly connected with a flange, an umbilical cable +/-800V power supply plug is connected to corresponding labels of end covers on the two sides of a power supply cabin, and an optical fiber socket is connected to an optical fiber socket of an electronic cabin. And the quick-locking buckle is opened.

    本发明涉及部署方法技术领域,提出了一种ROV快速部署方法,其采用集成式设计和自动化技术,大大简化了ROV的部署流程,节省了大量的时间和人力成本,提高了海上施工的效率和进度,减少人为操作带来的错误和风险,提升了工作的安全性和稳定性,包括括如下步骤:首先将ROV相关组件进行一体化集成,并预先连接好ROV相关组件间的所有接口,控制系统光纤通信接口和缆轴控制箱的光纤通信接口接,以供通信,将控制系统的高压供电接口和缆轴控制箱的供电接口连接,为ROV本体供电,电动缆轴的脐带缆穿过ROV本体承重头中间的孔,并固定连接法兰,将脐带缆±800V供电插头,连接至电源舱两侧端盖对应标签处,将光纤插座,连接至电子舱光纤插座处,打开快锁卡扣。


    Access

    Download


    Export, share and cite



    Title :

    ROV rapid deployment method


    Additional title:

    一种ROV快速部署方法


    Contributors:
    FENG XIAOXING (author) / LI ZE (author) / CAO CHUNTONG (author) / GAO FENG (author) / WANG RONGHUA (author) / MEI WEIDONG (author) / ZHANG JIN (author) / JI PENG (author) / MEI DEQUAN (author) / MA JIALIANG (author)

    Publication date :

    2024-12-17


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B63C LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS , Zuwasserlassen, Trockenstellen, Docken oder Bergen von Schiffen / B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS / H04B TRANSMISSION , Übertragung



    Deployment Threats to Rapid Deployment Forces

    F. W. Hegge / C. F. Tyner | NTIS | 1982


    Rapid Deployment UAV

    Cheng, Shun-Wen | IEEE | 2008


    TQM, Rapid Deployment

    Stolpman, J. L. / Air Traffic Control Association | British Library Conference Proceedings | 1992


    Rapid Prototyping and Deployment

    O'Hanley, J. / Robotics Industries Association | British Library Conference Proceedings | 1995


    Rapid Deployment Corner Reflector

    D. W. Rabenhorst / K. E. Darnell | NTIS | 1970