The invention discloses a train group dynamic simulation method jointly driven by a train operation plan and a speed curve. The method comprises the steps of constructing a system overall framework, constructing a grouping mechanism of the train plan, calculating a single-train speed curve, cooperatively calculating a multi-train speed curve and outputting a simulation result. According to the invention, high-authenticity train group simulation with a consistent railway operation environment is realized; a train plan homogeneity grouping mode is set and serves as the basis of train speed curve calculation, and calculation resources of train group speed curves are saved; and the calculation experiment function of train operation in various emergency scenes is enhanced.
一种列车运行计划与速度曲线联合驱动的列车群动态仿真方法,包括构建系统总体架构、构建列车计划的分组机制、计算单列车速度曲线、多列车速度曲线协同计算、输出仿真结果。本发明实现铁路运营环境一致的高真实性列车群仿真;设置了一种列车计划同质性分组的方式,并将其作为列车速度曲线计算的基础,节省了列车群速度曲线的计算资源;增强了对各类突发场景下列车运营的计算实验功能。
Train group dynamic simulation method jointly driven by train operation plan and speed curve
列车运行计划与速度曲线联合驱动的列车群动态仿真方法
2024-11-29
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Design of High Speed Train Operation Plan Simulation System
Springer Verlag | 2017
|Metro Train Comfortableness-Based Operation Curve Simulation
Trans Tech Publications | 2011
|Train speed limit determination method of train safety braking curve model
European Patent Office | 2022
|European Patent Office | 2024
|