The invention provides an enclosure system upper bridge plate engineering installation method which at least comprises the following steps that S100, different types of upper bridge plates are divided, the installation difficulty is determined, and the installation object quantity fraction of the upper bridge plates is obtained according to the installation difficulty; s200, according to the project target period, the daily installation object quantity score of the upper bridge plate is obtained; s300, the minimum value of the number of input gears of the installation gears is determined according to the daily installation object quantity fraction and the installation gear capacity; and S400, the number of input gears of the installation gears is determined according to the installation speed and the gluing speed. According to the technical scheme, the waiting waste time for mounting the upper bridge plate is shortened, the ideal operation state that all the operation steps do not interfere with one another and do not have waiting waste is achieved, and the efficient construction method is provided for construction of the Mark III enclosure system.
本申请提供了一种围护系统上桥板工程安装方法,至少包括以下步骤:S100:划分不同类型的上桥板并分别确定安装难度,根据安装难度进而获得上桥板的安装物量分数;S200:根据工程目标周期,得到上桥板的每日安装物量分数;S300:根据每日安装物量分数和安装档能力,确定安装档投入档数的最小值;S400:根据安装速度和打胶速度确定安装档投入档数。本申请技术方案减少了上桥板安装等待浪费时间,达到各作业步骤互不干涉且无等待浪费的理想作业状态,为MarkⅢ围护系统建造提供了一种高效率的建造方法。
Engineering installation method for upper bridge plate of enclosure system
一种围护系统上桥板工程安装方法
2024-10-29
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Installation method of enclosure system construction platform
European Patent Office | 2023
|