The invention discloses super-long overhanging peripheral arc-shaped beam construction equipment which comprises a plurality of sets of supporting columns and a connecting beam erected on the supporting columns and further comprises an overhanging beam installed on the connecting beam. The arc-shaped beam body is mounted at the outer end of the cantilever beam; the multiple groups of mounting units are arranged on the connecting beams and are used for mounting and butting the cantilever beams on the connecting beams; according to the construction equipment, through the arrangement of the mounting units, the mounting accuracy of the cantilever beam can be greatly improved, so that butt-joint mounting of the arc-shaped beam bodies is facilitated, meanwhile, the stability of the cantilever beam after mounting is further improved in cooperation with the arrangement of the supporting units, and the construction efficiency is improved. Therefore, the stability of the arc-shaped beam body after installation is improved, and the stability of the whole formed after installation of the next arc-shaped beam body is further enhanced.

    本发明公开了一种超长悬挑的外围弧形梁施工设备,包括多组支撑柱、架设于支撑柱上的连接梁,还包括:悬挑梁,安装于连接梁;弧形梁本体,安装于悬挑梁外端;多组安装单元,设置于连接梁上,用于悬挑梁于连接梁上安装对接;多组支撑单元,相应设置于安装单元上,本施工设备通过安装单元的设置,可使悬挑梁的安装精准度大大增加,从而便于后面弧形梁本体对接安装,同时配合支撑单元的设置,进一步增加悬挑梁在安装后的稳定型,从而增加弧形梁本体在安装后的稳定型能,也便于进一步加强下一段弧形梁本体的安装后形成的整体的稳定型。


    Access

    Download


    Export, share and cite



    Title :

    Super-long overhanging peripheral arc-shaped beam construction equipment and construction method


    Additional title:

    一种超长悬挑的外围弧形梁施工设备及施工方法


    Contributors:
    ZHU XINZHONG (author) / CAO RUIXUE (author) / LIU HUI (author) / WANG LE (author) / DONG YUNJIAN (author) / LI QIANG (author) / WANG JINGFENG (author) / LI BEIBEI (author) / TIAN PENGFEI (author) / CHANG LILI (author)

    Publication date :

    2024-10-18


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E04G SCAFFOLDING , Baugerüste / B66D Haspeln , CAPSTANS / E04B Allgemeine Baukonstruktionen , GENERAL BUILDING CONSTRUCTIONS



    On-beam inverted super-long equipment rail mounting structure and construction method

    LIN YI / WEI GANG / ZHANG HAN et al. | European Patent Office | 2024

    Free access

    Overhanging type prefabricated stand plate sliding installation device and construction method thereof

    PENG SHU / ZHOU JINGKANG / CHEN KAI et al. | European Patent Office | 2021

    Free access

    JIB OVERHANGING DEVICE

    SAITO KUNIHIRO | European Patent Office | 2020

    Free access

    OVERHANGING STORAGE MECHANISM FOR JIB

    HARAUCHI YUJI / HATA YUKI | European Patent Office | 2018

    Free access

    OVERHANGING STORAGE MECHANISM FOR JIB

    HARAUCHI YUJI / HATA YUKI | European Patent Office | 2016

    Free access