The embodiment of the invention provides a train extended operation scheduling method and device, equipment and a storage medium. The method is applied to the technical field of rail transit operation management and operation control. The method comprises the steps of obtaining extended operation information and a target parking strategy; according to the extended operation information and the target parking strategy, a vehicle bottom scheduling scheme is determined, and the vehicle bottom scheduling scheme comprises a parking vehicle bottom scheduling scheme; and compiling a working diagram based on the train bottom scheduling scheme to obtain a train working diagram of train extended operation. In this way, dynamic compiling and adjusting of the running diagram can be achieved, the special requirement for prolonging the operation period can be fully considered, and the scheduling flexibility is improved.
本公开的实施例提供了一种列车延长运营调度方法、装置、设备以及存储介质。应用于轨道交通运营管理与运行控制技术领域,所述方法包括获取延长运营信息和目标驻车策略;根据延长运营信息和目标驻车策略,确定车底调度方案,其中,车底调度方案包括驻车车底调度方案;基于车底调度方案进行运行图编制,得到列车延长运营的列车运行图。以此方式,可以实现运行图的动态编制和调整,能够充分考虑延长运营期间的特殊需求,提高调度的灵活性。
Train extended operation scheduling method, device and equipment and storage medium
列车延长运营调度方法、装置、设备以及存储介质
2024-10-01
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
European Patent Office | 2024
|Train scheduling optimization method, device and equipment and storage medium
European Patent Office | 2024
|Train operation control method, device and equipment and storage medium
European Patent Office | 2024
|Train operation control method, device and equipment and storage medium
European Patent Office | 2025
|Train operation control method, device and equipment and storage medium
European Patent Office | 2024
|