The invention relates to the technical field of ship construction, and discloses a container ship mounting method, which is characterized in that a container ship is divided into a port side section, a transverse bulkhead section and a starboard side section, so that sectional construction of the container ship is realized; the installation of the first guide frame, the second guide frame and the third guide frame is divided into the assembly stages of a larboard side section, a transverse bulkhead section and a starboard side section, and compared with the previous technical scheme that the guide frames need to be installed on the container ship after the whole container ship is constructed, the installation process of the guide frames can be moved forwards, and the installation efficiency of the guide frames is improved; and the operation time and the operation difficulty of the subsequent process are reduced, the construction period of the container ship is shortened, and the cost is saved to the maximum extent.
本发明涉及船舶建造技术领域,公开了一种集装箱船安装方法,本发明实施例通过集装箱船分隔成左舷侧分段、横舱壁分段、右舷侧分段,以此实现集装箱船的分段建造,并且本申请通过将第一导架、第二导架以及第三导架的安装划分在左舷侧分段、横舱壁分段、右舷侧分段的组装阶段,相较以往需要在整个集装箱船完成建设后再将导架安装在集装箱船上的技术方案,本申请能够实现导架安装工序前移,减少后道工序的作业时间和作业难度,缩减集装箱船的建造周期,赢得最大程度的成本节约。
Container ship installation method
一种集装箱船安装方法
2024-07-19
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
Container ship positioning pin segmented installation precision control method and container ship
European Patent Office | 2023
|European Patent Office | 2019
|Container ship propeller replacement and installation method
European Patent Office | 2025
|Installation method for exhaust device of large container ship
European Patent Office | 2023
|