The anchor pile comprises a pile body, the bottom end of the pile body is connected with a pile tip, the top end of the pile body is connected with a loop bar, and a reserved groove a is formed in the loop bar; the upper portion of the pile body is connected with two lug seats, and the lower portion of the pile body is connected with two counter-force soil retaining plates. The heavy hammer comprises a hammer body, the top end of the hammer body is connected with a connector, and the outer wall of the hammer body is connected with a balance weight rod. The guide rod penetrates into the hammer body through the guide hole; the top end of the guide rod is connected with a piston; the bottom end of the guide rod is connected with a sleeve matched with the sleeve rod, and a reserved groove b is formed in the sleeve. A recycling cable penetrates through the reserved groove a and the reserved groove b, then extends into the pile body and penetrates out of the reserved hole, and then the two ends of the recycling cable are connected to the two soil retaining plates correspondingly; the two ends of the mooring rope are connected to the two lugs respectively. The problem that the exploration ship cannot be fixed is effectively solved in an anchor pile mode, and the anchor pile type exploration ship has the advantages of being low in cost, high in operability, wide in application range, capable of being recycled and the like.

    本发明公开了一种海域施工船锚固桩及成桩工艺,锚桩包括桩身,桩身的底端连接有桩尖,桩身顶端连接有套杆,套杆上设有预留槽a;桩身上方连接有两个耳座,桩身下方连接有两个反力挡土板;重锤包括锤身,锤身的顶端连接有接头,锤身的外壁连接有配重杆;导杆通过导向孔穿入锤身内部,导杆顶端连接有活塞;导杆的底端连接有与套杆适配的套管,套管上设有预留槽b;回收缆穿过预留槽a、预留槽b后伸入桩身内并从预留孔穿出后,回收缆的两端分别连接于两个挡土板上;系泊缆的两端分别连接于两个耳座上。本发明采用锚桩方式有效地解决了勘探船只无法固定的问题,具有成本低、可操作性强、适用范围较广以及可回收利用等优势。


    Access

    Download


    Export, share and cite



    Title :

    Sea area workboat anchoring pile and pile forming process


    Additional title:

    一种海域施工船锚固桩及成桩工艺


    Contributors:
    YANG JIANBIAO (author) / WANG WANLI (author) / HUA CHANGJUN (author) / YANG YUE (author) / WAN YOU (author) / WU XIAOQIANG (author)

    Publication date :

    2024-05-03


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E02D FOUNDATIONS , Gründungen / B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS



    Precast pile offshore piling workboat

    ZHANG WEI / ZHOU CHENGLONG / GAO XIONGJIE et al. | European Patent Office | 2023

    Free access

    Novel workboat suitable for single pile foundation pile sinking and construction method

    LING JIANAN / LUO WEN / TANG XUAN et al. | European Patent Office | 2023

    Free access

    Workboat range

    Online Contents | 1995


    Culturing workboat

    LI HUI / LI HONGFU / LI HAIQING | European Patent Office | 2021

    Free access

    Workboat propulsion

    Online Contents | 1997