The invention provides a special-shaped subway station combined foundation pit reinforcing excavation construction system and method, and relates to the field of building construction.The special-shaped subway station combined foundation pit reinforcing excavation construction system comprises an anti-disengagement lock column, the anti-disengagement lock column is longitudinally connected to one side of the bottom of an installation hook in an inserted mode, and a hanging assembly can adaptively control the use state of the anti-disengagement lock column; after materials are not hoisted or hoisted materials stably fall to the ground, the anti-falling lock column can be automatically opened, operation of hooking and removing the materials by people is facilitated, meanwhile, the anti-falling lock column can be automatically closed when the materials are hoisted, the phenomenon that a hooking cable of the materials is separated from an installation hook body in the hoisting process of the materials is avoided, use is stable, and the practicability is high. The safety buckle of the lifting hook of the tower crane for excavation of the foundation pit simplifies the operation process during material lifting, and solves the problems that the safety buckle of the lifting hook of the existing tower crane for excavation of the foundation pit does not have an adaptive opening and closing function, that is, manual buckle opening and buckle closing operation is needed during material lifting and material removing each time, and the operation is troublesome.

    本发明提供一种异型地铁车站组合基坑加固开挖施工系统及方法,涉及建筑施工领域,包括:防脱锁柱,所述防脱锁柱纵向的插接在安装钩体底部的一侧,吊挂组件能够适应性的控制防脱锁柱的使用状态,具体来说,就是在不吊运物料或者吊运的物料平稳落地后,防脱锁柱能够自动开启,方便人们挂接物料和摘除物料的操作,同时在吊运物料时防脱锁柱能够自动关闭,避免物料在吊运过程中其挂接缆绳脱出安装钩体的现象发生,使用稳定,简化了吊运物料时的操作流程,解决了现有基坑开挖用塔吊吊钩的安全扣不具备适应性启闭的功能,即每次在吊运物料以及摘除物料时,均需要人工进行开扣和关扣的操作,操作麻烦的问题。


    Access

    Download


    Export, share and cite



    Title :

    Special-shaped subway station combined foundation pit reinforcement excavation construction system and method


    Additional title:

    一种异型地铁车站组合基坑加固开挖施工系统及方法


    Contributors:
    YANG FAN (author) / ZHAN FUMIN (author) / ZHOU PING (author) / XIE XIANLONG (author) / XIE RENLIANG (author) / ZOU BAOPING (author) / ZHU XIAOJUN (author) / HE SHOUHAI (author) / LI DEMING (author) / SONG WENKUI (author)

    Publication date :

    2024-04-26


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E02D FOUNDATIONS , Gründungen / B66C Krane , CRANES / G01D MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE , Anzeigen oder Aufzeichnen in Verbindung mit Messen allgemein



    Undercutting-covered excavation semi-reverse construction method of cross-transfer subway station

    LEI GANG / YANG ZHIHUI / HUA FUCAI et al. | European Patent Office | 2024

    Free access

    Station foundation pit engineering cover excavation construction method

    PAN WEIQIANG / ZHANG YAOSAN / ZHU YANFEI et al. | European Patent Office | 2021

    Free access

    Subway underground excavation construction material hoisting device

    MA WENSHUAI / CAO XINYAN / ZHAO XIA et al. | European Patent Office | 2023

    Free access


    Study of Influence of Subway Station Excavation on Existing Metro Deformation

    Li, Y.-P. / Wang, Z.-Y. | British Library Conference Proceedings | 2009