The invention provides a method for a girder transporting vehicle to carry a bridge girder erection machine to integrally pass through a tunnel. The girder transporting vehicle and a carrying support are used in the method. The method comprises the following steps that S1, a front carrying support is hoisted and fixed to a front beam transporting vehicle, and a rear carrying support is hoisted and fixed to a rear beam transporting vehicle; s2, the rear supporting leg is turned over and lifted up, the front beam transporting vehicle and the rear beam transporting vehicle run to the position between the middle supporting leg and the rear supporting leg, and the rear supporting leg is turned over and supported on the beam face; s3, the middle supporting leg is contracted to leave the ground, the front crane carriage drives the middle supporting leg to move to the position close to the front supporting leg, and the middle supporting leg is supported in place; s4, the front beam transporting vehicle and the rear beam transporting vehicle respectively walk to a carrying position; s5, the front supporting leg, the middle supporting leg and the rear supporting leg of the bridge girder erection machine alternately descend, and the machine arm falls on the carrying support; s6, the middle supporting legs are contracted and suspended, and the middle supporting legs are rotated relative to the machine arms and fixed; the front supporting legs, the rear supporting legs and the front auxiliary supporting legs are all retracted to leave the ground. The transfer efficiency of the bridge girder erection machine is improved.

    本发明提供一种运梁车驮运架桥机整体过隧道的方法,方法使用到运梁车及驮运支架;方法包括以下步骤:步骤S1,将前驮运支架吊装并固定在前运梁车上,将后驮运支架吊装并固定在后运梁车上;步骤S2,后支腿翻折抬起,前运梁车与后运梁车行驶至中支腿与后支腿之间,后支腿翻折支撑在梁面上;步骤S3,中支腿收缩离地,前起重小车驱动中支腿移动至靠近前支腿位置,中支腿到位支撑;步骤S4,前运梁车与后运梁车分别走行至驮运位;步骤S5,架桥机前支腿、中支腿与后支腿交替下降,将机臂落在驮运支架上;步骤S6,中支腿收缩悬空,将中支腿相对于机臂旋转,并进行固定;前支腿、后支腿以及前辅助支腿均收缩离地。提高了架桥机转运效率。


    Access

    Download


    Export, share and cite



    Title :

    Method for carrying bridge girder erection machine to integrally pass through tunnel by girder transporting vehicle


    Additional title:

    一种运梁车驮运架桥机整体过隧道的方法


    Contributors:
    CHEN JIZHONG (author) / SUN ZHI (author) / LIU CHAOYANG (author) / QIN HONGYI (author) / ZHANG YOUKUN (author) / ZHANG SHUAI (author) / ZHANG XIAOSHUI (author) / FENG TAO (author) / ZHANG GAOBO (author) / SU HAIMING (author)

    Publication date :

    2024-04-05


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B65G TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS , Transport- oder Lagervorrichtungen, z.B. Förderer zum Laden oder Abladen / B60P Fahrzeuge zum Transport von Lasten oder zum Befördern, Tragen oder Aufnehmen besonderer Lasten oder Gegenstände , VEHICLES ADAPTED FOR LOAD TRANSPORTATION OR TO TRANSPORT, TO CARRY, OR TO COMPRISE SPECIAL LOADS OR OBJECTS



    Girder transporting vehicle and method for carrying bridge girder erection machine

    WU GUOMEI / DAVID NICHOLAS TAYLOR / TAO HONGYI | European Patent Office | 2021

    Free access

    Bridge girder erection motorboat

    WANG WEI / LIU YANG / ZHOU JIAN et al. | European Patent Office | 2021

    Free access

    Construction method for assembling bridge girder erection machine through rubber-tyred girder lifter

    LEE DONG WON / CHEN JIZHONG / ZHANG YOUKUN et al. | European Patent Office | 2024

    Free access

    Method for installing bridge girder erection machine at tunnel exit

    SONG CHAO / LIU YONGSONG / DONG JIANZHAO et al. | European Patent Office | 2021

    Free access

    Steel truss girder bridge girder transporting flatcar

    ZHANG LIYUN | European Patent Office | 2021

    Free access