The invention provides a wind power arm installation method. The wind power arm installation method comprises the following steps that S1, a main suspension arm is installed, and the main suspension arm is horizontally placed on a to-be-installed surface; s2, a wind power arm, a front pull rod and a rear pull rod are pre-installed; s3, the wind power arm and the main suspension arm are installed, and one end of the wind power arm is installed at the upper end of the main suspension arm; s4, wind power arm working condition electrical wiring; s5, supporting rod installation, wherein a supporting rod is installed at the joint of the wind power arm and the main suspension arm; s6, connecting front and rear pull pipes of the wind power arm; s7, the supporting rod is pulled up through the auxiliary crane; according to the wind power arm installation method, through mutual cooperation of all the steps, the convenience of wind power arm installation is improved, meanwhile, scenes needed by construction are reduced, and installation of the wind power arm can adapt to more construction environments.
本发明提供了风电臂安装方法。该风电臂安装方法包括以下步骤:S1、主吊臂安装,将主吊臂水平放置于待安装面;S2、风电臂、前拉杆和后拉杆预安装;S3、风电臂与主吊臂安装,将风电臂一端安装至主吊臂上端;S4、风电臂工况电气接线;S5、撑杆安装,将撑杆安装至风电臂与主吊臂连接处;S6、连接风电臂前后拉管;S7、利用辅助起重机将撑杆拉起;S8、主变幅卷扬收绳,将主吊臂拉起,其中,本发明的风电臂安装方法通过各个步骤的相互配合提高了风电臂安装的便捷性,同时,也减少了施工所需的场景,能够使得风电臂的安装适应更多的施工环境。
Wind power arm installation method
风电臂安装方法
2024-04-02
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|Installation equipment and installation method of offshore wind power device
European Patent Office | 2023
|