The invention discloses a building construction hoisting structure for a fabricated building, which comprises a main body frame unit, the main body frame unit comprises a hoisting frame and a cover plate matched with the hoisting frame, the top ends of the four sides of the hoisting frame are fixedly connected with four groups of slings, and the top ends of the slings are fixedly connected with connectors; a lifting ring is fixedly mounted at the top end of the connector; and the placing unit comprises four protection blocks fixedly installed on the two sides of an inner cavity of the hoisting frame, and a first sliding groove is formed in one side of a first synchronous wheel. Reinforcing steel bars are guided through a guiding slope designed for the placing frame, meanwhile, the placing frame descends through the gravity of the reinforcing steel bars, and the reinforcing steel bars are placed in the first sliding groove; and the rotating rod is promoted to drive the collision block to collide with the L-shaped connecting rod, so that the vibration plate collides with the placed reinforcing steel bars, the reinforcing steel bars retained in the middle of the supporting frame are guided to move towards the storage groove, and convenience is provided for subsequent binding operation.
本发明公开了一种装配式建筑用建筑施工吊装结构,包括:主体框架单元,其包括导致吊装框架以及与导致吊装框架相匹配安装的盖板,所述导致吊装框架四侧的顶端固定连接有四组吊索,所述吊索的顶端固定连接有连接器,所述连接器的顶端固定安装有吊环;放置单元,其包括固定安装在导致吊装框架内腔两侧的保护块,所述保护块的数量为四,所述第一同步轮的一侧开设有第一滑槽,本发明通过放置架设计的导向斜面钢筋对钢筋进行导向,同时钢筋本身的重力使放置架下降,促使旋转杆带动碰撞块撞击L形连接杆,使使震动板与放置的钢筋发生碰撞,引导滞留在支撑架中部的钢筋向收纳槽移动,为后续的捆扎操作提供了便利。
Building construction hoisting structure and method for fabricated building
一种装配式建筑用建筑施工吊装结构及其方法
2024-03-29
Patent
Electronic Resource
Chinese
IPC: | B66C Krane , CRANES |