According to the linkage device and method of the CTC system and the train sand table model, the CTC system sends a train operation stage plan to an autonomous machine through a communication server, converts the plan into route information and sends the route information to an interlocking system and an RBC/train control system of a simulation system to execute a signal opening action. The CTC system sends a train operation stage plan to a train control system of the simulation system through the CTC interface server, the train is controlled to be added to a preset position of a station yard at a planned time point, and a train operation speed curve is generated to guide the train to operate at a specified speed. The signal open state of the simulation system and the train operation system can be fed back to the CTC system for display through the CTC interface server, the CTC system forwards the information to the sand table system through the interface server, and the sand table central control system controls operation of a signal machine, a turnout, a track circuit and a train in the system according to the received information. The system is flexible in framework, high in adaptability, low in manufacturing cost and high in expansibility, and the whole train operation process can be grasped globally.
一种CTC系统与列车沙盘模型的联动装置和联动方法,CTC系统通过通讯服务器发送列车运行阶段计划给自律机,将计划转换为进路信息发送给仿真系统的联锁系统和RBC/列控系统执行信号开放动作。CTC系统通过CTC接口服务器发送列车运行阶段计划给仿真系统的列车控制系统,控制列车在计划时间点在站场预定位置添加上列车,生成列车运行速度曲线指导列车以规定的速度运行。仿真系统的信号开放状态及列车运行系统会通过CTC接口服务器反馈给CTC系统进行显示,CTC系统把这些信息通过接口服务器转发送给沙盘系统,沙盘中控系统根据收到的信息控制系统中的信号机、道岔、轨道电路和列车运行。本发明架构灵活,适配力强,造价低,扩展性强,可从全局把握整个列车运转过程。
Linkage device and linkage method of CTC system and train sand table model
一种CTC系统与列车沙盘模型的联动装置和联动方法
2024-03-22
Patent
Electronic Resource
Chinese
LINKAGE TABLE DATA GENERATING DEVICE AND LINKAGE TABLE DATA GENERATION METHOD
European Patent Office | 2020
|ELEVATOR SYSTEM, LINKAGE DEVICE, LINKAGE METHOD, AND LINKAGE PROGRAM
European Patent Office | 2024
|