The invention provides a train operation plan transmission method and device. The train operation plan transmission method comprises the steps that the operation state of a train is obtained; periodically sending a first plan information frame to an application operation and maintenance management platform AOM according to the train operation state, wherein the AOM is used for replying packet sequence numbers or periodically sending timestamps according to different target plan information frames; and updating the first plan information frame according to feedback information sent by the AOM to obtain a second plan information frame, and periodically sending the second plan information frame to the AOM, so that the train runs according to the second plan information frame. According to the method, the complete train time sent by the ATS is accurately obtained after the train is awakened or in the running process, so that train-mounted follow-up autonomous access handling and running according to the running diagram are supported, meanwhile, the error rate during running plan transmission is reduced, and the train running efficiency is improved.
本发明提供一种列车运行计划传输方法及装置,该列车运行计划传输方法包括:获取列车的运行状态;根据列车运行状态向应用运维管理平台AOM周期性地发送第一计划信息帧,AOM用于根据不同的目标计划信息帧按包回复包序号或者周期性的发送时间戳;根据AOM发送的反馈信息更新第一计划信息帧,得到第二计划信息帧,并将第二计划信息帧周期性的发送至AOM,以供列车根据第二计划信息帧运行。本发明所述方法实现了在列车唤醒后或者运行过程中,准确获取ATS发送的该车完整列车时刻,从而支持车载后续自主办理进路以及根据运行图运行,同时降低了运行计划传输时的出错率,提高了列车运行效率。
Train operation plan transmission method and device
列车运行计划传输方法及装置
2024-02-27
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Travel plan calculation device and automatic train operation device
European Patent Office | 2023
|TRAVEL PLAN CALCULATION DEVICE AND AUTOMATIC TRAIN OPERATION DEVICE
European Patent Office | 2023
|TRAVEL PLAN CALCULATION DEVICE AND AUTOMATIC TRAIN OPERATION DEVICE
European Patent Office | 2025
TRAVEL PLAN CALCULATION DEVICE AND AUTOMATIC TRAIN OPERATION DEVICE
European Patent Office | 2023
|