The invention relates to the technical field of elevator construction, in particular to a construction elevator operation method and device. The method comprises the following steps: setting a normal default response state; setting a priority time period, wherein the corresponding call information in the priority time period is preferably responded in the priority time period; setting a priority floor, and preferentially responding to call information of the priority floor; wherein the priority of the priority time period is greater than the priority of the priority floor, and the priority of the priority floor is greater than the priority of the normal default response state. The calling condition is refined through the multi-button calling device, priority selection is carried out through the controller, elevator drivers are helped to better discriminate the stopping requirements of all floors, time waste caused by mistaken stopping is avoided, and therefore the construction elevator is more efficiently utilized to carry out on-site personnel and material transportation, and the working efficiency is improved. And the purpose of promoting efficient and orderly operation of construction site production work is achieved.
本发明涉及电梯施工技术领域,尤其是涉及一种施工电梯运行方法和运行装置。所述方法,包括设置平时默认响应状态;设置优先时间段,所述优先时间段内优选响应优先时间段内对应的呼叫信息;设置优先楼层,优先响应优先楼层的呼叫信息;其中,所述优先时间段的优先级大于优先楼层的优先级,所述优先楼层的优先级大于平时默认响应状态的优先级。本发明通过多按钮呼叫器细化呼叫情况,由控制器进行优先选择,帮助电梯司机更好地甄别出各楼层停靠需求,避免因“误停”造成时间的浪费,从而更高效地利用施工电梯进行现场人员及物料的运送,达到推进施工现场生产工作高效有序进行的目的。
Construction elevator operation method and operation device
一种施工电梯运行方法和运行装置
2024-01-02
Patent
Electronic Resource
Chinese
IPC: | B66B Aufzüge , ELEVATORS |
European Patent Office | 2021
|European Patent Office | 2019
|ELEVATOR LANDING OPERATION DEVICE AND ELEVATOR OPERATION PROCESSING METHOD
European Patent Office | 2021
|ELEVATOR OPERATION MANAGING DEVICE AND ELEVATOR OPERATION MANAGING METHOD
European Patent Office | 2019
|European Patent Office | 2018
|