The invention relates to the technical field of tower cranes, in particular to a tower crane based on steel structure construction installation, which comprises a precise hoisting adjusting tool installed on the tower crane, the precise hoisting adjusting tool comprises a clamping device, and fixed pulling limiting devices are symmetrically installed on two sides of the clamping device. The top of the clamping device is provided with a left-right balance adjusting device, the top of the left-right balance adjusting device is provided with a rotating lifting frame, the rotating lifting frame is fixedly connected with a lifting rope of the tower crane, the lifting rope of the tower crane is further provided with a front-back balance adjusting device, and the adjusting end of the front-back balance adjusting device is connected with the clamping device. According to the hoisting device, the hoisting efficiency can be effectively improved, and meanwhile, the hoisting manpower is saved.
本发明涉及塔式起重机技术领域,具体是涉及一种基于钢结构施工安装的塔式起重机,包括安装在塔式起重机上的精准吊装调整具,精准吊装调整具包括安装在夹持装置,夹持装置的两侧对称安装有固定拉扯限位装置,夹持装置的顶部安装有左右平衡调整装置,左右平衡调整装置的顶部安装有转动吊装架,转动吊装架与塔式起重机的吊绳上固定连接,塔式起重机的吊绳上还安装有前后平衡调整装置,前后平衡调整装置的调整端与夹持装置连接,准吊装调整具上还安装有监控摄像头,本申请可有效的提高吊装的效率,同时节省吊装人力。
Tower crane based on steel structure construction and installation
一种基于钢结构施工安装的塔式起重机
2023-12-29
Patent
Electronic Resource
Chinese
IPC: | B66C Krane , CRANES |
Tower crane installation construction method and installation equipment thereof
European Patent Office | 2024
|Installation and construction method of underwater tower crane
European Patent Office | 2023
|