A method for installing a longitudinal inclined slipway steel underwater slideway comprises the following steps that S1, a first base is installed on the side face of a first steel underwater slideway, and a first flange screw and a first fixing screw are installed on the side face of the first steel underwater slideway; s2, adjusting the center points C3 and C4 of the first steel underwater slideway to be on the same straight line with C1 and C2; s3, a second base is installed on the side face of the second steel underwater slide way, and an adjusting bolt is installed on the second base; a second flange screw and a second fixing screw are mounted on the side surface of the second steel underwater slideway; s4, pre-assembling on land; S5, mounting a first steel underwater slideway; s6, mounting a second steel underwater slideway; and S7, checking and cutting off the first door-shaped marker post, the second door-shaped marker post and the third door-shaped marker post. Compared with the prior art, the method is high in installation accuracy and simple in steps and operation.
一种安装纵向斜船台钢制水下滑道的方法,包括以下步骤:S1、在第一钢制水下滑道侧面安装第一底座,在第一钢制水下滑道侧面安装第一法兰螺丝和第一固定螺丝;S2、将第一钢制水下滑道的中心点C3和C4调整到同C1和C2在一条直线上;S3、在第二钢制水下滑道的侧面安装第二底座,第二底座上安装调节螺栓;在第二钢制水下滑道侧面安装第二法兰螺丝和第二固定螺丝;S4、陆地预拼S5、安装第一块钢制水下滑道;S6、安装第二钢制水下滑道;S7、检查,并割除第一门型标杆、第二门型标杆和第三门型标杆。与现有技术相比,本发明安装准确度高,步骤和操作简单。
Method for installing steel underwater slideway of longitudinal inclined slipway
一种安装纵向斜船台钢制水下滑道的方法
2023-11-10
Patent
Electronic Resource
Chinese
IPC: | B63C LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS , Zuwasserlassen, Trockenstellen, Docken oder Bergen von Schiffen |