The invention provides a ship pipe frame manufacturing and mounting method which comprises the following steps: S1, dividing a whole pipe frame to be built into a plurality of pipe frame units by taking a maximum block joint of a main deck block assembly as a breaking point; s2, a pipe frame unit is manufactured, specifically, a pipe frame unit manufacturing site is selected, a jig frame structure is installed on the pipe frame unit manufacturing site, the jig frame structure comprises a jig frame base end face and supporting columns perpendicularly arranged on the jig frame base end face, and the height difference between the corresponding supporting faces of the supporting columns is consistent with the height difference between the corresponding supporting faces of the ship body main deck; a pipe support is installed on the corresponding supporting face of the supporting column of the jig frame structure, and a pipe unit is installed on the pipe support; s3, the manufactured pipe frame units are hoisted to the corresponding area of the main deck of the ship body, and splicing of the multiple pipe frame units is completed; through the manufacturing method of reasonably dividing the pipe frame units and then splicing the pipe frame units, the situation that the pipes spliced and folded by small units are cut due to deviation numerical values is avoided, and the number of the pipes calibrated at present is reduced.

    本发明提供一种船舶管架制作安装方法,包括如下步骤:S1、根据主甲板分段总组的最大总段接缝为取断点,将待建造的整体管架划分为多个管架单元;S2、制作管架单元:选取管架单元制作场地,在管架单元制作场地上安装胎架结构,胎架结构包括胎架基座端面以及垂直布置于胎架基座端面的支撑柱,支撑柱相应的支撑面之间的高度差与船体主甲板相应支撑面之间的高度差一致;在胎架结构的支撑柱相应的支撑面上安装管子支架,并在管子支架上安装管子单元;S3、将制作完成的管架单元吊装至船体主甲板对应区域,完成多个管架单元的拼接;通过该合理地划分管架单元,再拼接管架单元的制造方法,杜绝了小单元拼接合拢的管子因偏差数值开刀的情况,减少了现校管数量。


    Access

    Download


    Export, share and cite



    Title :

    Manufacturing and mounting method for ship pipe frame


    Additional title:

    一种船舶管架制作安装方法


    Contributors:
    LIAO XUEDONG (author) / LI QIHONG (author) / PAN BO (author)

    Publication date :

    2023-06-27


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS



    Manufacturing and mounting method of container ship guide frame

    PENG JIANHUA / WANG LAN / CHEN DEJIN | European Patent Office | 2015

    Free access

    Ship suspension lapping frame and mounting method thereof

    FAN JIYIN / WANG ZEDONG / YOU YUNHUI et al. | European Patent Office | 2021

    Free access

    Mounting tool for ship pipe joint and using method of mounting tool

    YE WEIGEN / XIE ZHUI / ZHANG FEIFEI et al. | European Patent Office | 2024

    Free access

    Mounting frame structure of cruise ship massage bathtub

    XIAO HAO / HE CHENGNENG / CHEN ZHENGYUN et al. | European Patent Office | 2023

    Free access

    Method for forming broadside connecting pipe mounting hole in ship

    ZHOU QIANGUANG / ZHOU YONGHUI / FU YUEKAI | European Patent Office | 2022

    Free access