The invention discloses pile and beam integrated equipment. The pile and beam integrated equipment comprises a rack, a hoisting assembly and a piling assembly. The rack comprises two main beams, and the two main beams are connected through connecting cross beams at the two ends. The hoisting assembly comprises a beam hoisting crown block and a pile hoisting crown block. And the beam hoisting crown block and the pile hoisting crown block are movably mounted on the rack and are both provided with cranes. The hanging beam crown block is used for achieving longitudinal moving, transverse moving, rising and falling and rotating operation of the beam piece. And the pile hoisting crown block is used for hoisting and transporting the prefabricated pipe pile. The piling assembly is arranged at one end of the rack. The piling assembly comprises a longitudinal moving cross beam assembly, a transverse moving cross beam assembly and a piling frame. The piling frame is installed on the machine frame through the longitudinal moving cross beam assembly and the transverse moving cross beam assembly. And a drilling piece and a piling piece are arranged on the piling frame. And meanwhile, pavement of shortcuts and trestles and the help of large ship machine equipment are not needed, horizontal transportation, pile feeding, piling, pile splicing and pile cutting of the precast piles can be completed, the cast-in-place condition of an existing bent cap is changed, and the surrounding geographical and ecological environment is protected.

    本发明公开了一种桩梁一体化设备,包括机架、起重组件和打桩组件。机架包括两根主梁,两根主梁之间通过两端的连接横梁进行连接。起重组件包括吊梁天车和吊桩天车。吊梁天车和吊桩天车活动式安装在机架上,且均配备有起重机。吊梁天车用于实现梁片的纵移、横移、起落及旋转作业。吊桩天车用于实现预制管桩的吊装和运输作业。打桩组件设置在机架的一端。打桩组件包括纵移横梁总成、横移横梁总成和打桩架。打桩架通过纵移横梁总成和横移横梁总成安装在机架上。打桩架上设置有钻孔件和打桩件。同时不需铺设便道、栈桥和借助大型船机设备,能够完成预制桩水平运输、喂桩、打设、接桩和截桩,改变现有盖梁现场浇筑情况,保护了周围地理和生态环境。


    Access

    Download


    Export, share and cite



    Title :

    Pile-beam integrated equipment


    Additional title:

    一种桩梁一体化设备


    Contributors:
    LIN WENPIAO (author) / YANG XINGYI (author) / ZOU ZEYU (author) / HE LI (author) / HUANG QIAOMIN (author) / WANG PENG (author)

    Publication date :

    2023-06-23


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E01D BRIDGES , Brücken / B66C Krane , CRANES / E02D FOUNDATIONS , Gründungen



    High-pile wharf beam and slab erecting integrated equipment

    ZHOU HE / LI MING / YU JUNZHI et al. | European Patent Office | 2024

    Free access

    Pile-beam integrated bridge girder erection machine

    YU JUNZHI / YANG WU / GAN LI et al. | European Patent Office | 2025

    Free access

    Integrated pile turning and transferring equipment

    LIN DENG / LIN YONG'AN / JIA MIN | European Patent Office | 2020

    Free access

    Waterproof charging pile for wind storage integrated equipment

    WANG QINGPU / YU XIAODONG / ZHOU GUANGXU et al. | European Patent Office | 2024

    Free access

    SUCTION PILE EQUIPMENT

    DINGMAN SCOTT P | European Patent Office | 2020

    Free access