The invention relates to a wind power operation and maintenance deck barge which is characterized in that a main deck is arranged on the upper surface of a barge body, a forecastle is arranged on the main deck located on a bow, the main deck comprises a storage room area deck, a service station area deck and a loading area deck from front to back in sequence, sunken outfitting assemblies are arranged on the two sides of the loading area deck, and each sunken outfitting assembly comprises a bollard trunk, a bollard body is arranged in the bollard trunk; sunken winch chambers are symmetrically arranged below loading area decks on the two sides of the stern, winches are installed in winch wells of the sunken winch chambers, one ends of anchor cables are connected with the winches, and the other ends of the anchor cables penetrate through the loading area decks to be connected with positioning anchors arranged at the tail of the ship body. A watertight hatch cover is arranged on the upper surface of the main deck. Therefore, the gravity center of the ship is lowered, the stability of the ship is improved, and it is guaranteed that the deck area is large enough and regular enough, so that the ship is suitable for transportation of super-large, super-long and super-wide wind power operation and maintenance equipment, and the space requirement is met.
本发明涉及一种风电运维甲板驳船,船体上表面设置主甲板,位于船首的主甲板上设置首楼,主甲板从前向后依次为储藏间区甲板、服务处所区甲板和装货区甲板,装货区甲板两侧设置有下沉式舾装组件,下沉式舾装组件包括带缆桩围井,带缆桩围井内设置有带缆桩体;船尾两侧的装货区甲板下方对称设置有下沉式绞车室,下沉式绞车室的绞车井内安装有绞车机,锚索一端与绞车机连接,锚索另一端穿过装货区甲板与设置于船体尾部的定位锚相连;主甲板上表面设置有水密舱口盖。从而降低船舶的重心,提高船舶的稳性,且保证具有足够大且足够规整的甲板面积,以适应超大、超长、超宽的风电运维设备的运输,以满足空间需求。
Wind power operation and maintenance deck barge
一种风电运维甲板驳船
2023-06-06
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |
CONTRACTS - Vigor delivers deck barge to Harley
Online Contents | 2013
Movable deck cushion block for SPMT shipment transportation barge
European Patent Office | 2021
|