The invention discloses a construction method for mounting a steel cover beam on a concrete-filled steel tube arch bridge, and belongs to the technical field of bridge engineering structure designing and manufacturing processes. According to the construction method for installing the steel cover beam on the concrete-filled steel tube arch bridge, the construction efficiency is relatively high, and the construction quality, especially the linear quality of the arch bridge, can be relatively guaranteed. According to the construction method, when the steel cover beam on the arch is prepared, the bottom connecting column head assembly at the bottom is not assembled and welded firstly, and after other parts except the connecting column head assembly are assembled and welded and are detected to be qualified, the bottom connecting column head assembly is constructed on the bottom connecting column head assembly; the bottom connecting column head assembly is movably arranged at the bottom of the steel cover beam on the arch through the fixed cross beam, then the steel cover beam on the arch is hoisted to the concrete-filled steel tube arch bridge through hoisting equipment, and the movable bottom connecting column head assembly and the corresponding position of the concrete-filled steel tube arch bridge are connected into a whole in the adjusting process.

    本发明公开了一种用于钢管混凝土拱桥拱上钢盖梁安装的施工方法,属于桥梁工程结构物设计制造工艺技术领域。提供一种施工效率相对较高,能相对保证施工质量,尤其是拱桥线形质量的用于钢管混凝土拱桥拱上钢盖梁安装的施工方法。所述的施工方法,通过在制备拱上钢盖梁时,对底部的底部连接柱头组件先不进行装焊,待整除连接柱头组件以外的其它部位组焊完成、检测合格后再在其上施工底部连接柱头组件,并将所述的底部连接柱头组件通过固定横梁活动的布置到拱上钢盖梁的底部,然后再通过起重设备将拱上钢盖梁吊装到钢管混凝土拱桥上通过活动的底部连接柱头组件与钢管混凝土拱桥的相应位置在调整过程中连接为一个整体。


    Access

    Download


    Export, share and cite



    Title :

    Construction method for installing steel cover beam on concrete-filled steel tube arch bridge


    Additional title:

    用于钢管混凝土拱桥拱上钢盖梁安装的施工方法


    Contributors:
    GONG QINGFU (author) / XU HANG (author) / SUN HAOLIN (author) / LI XINGQUAN (author) / YANG YAFANG (author) / QIU YANG (author) / YUE WENGANG (author) / LI WENLONG (author)

    Publication date :

    2023-04-18


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    E01D BRIDGES , Brücken / B66C Krane , CRANES



    Method for installing tower crane on steel tube arch bridge

    HOU KAIWEN / LUO XIAOBIN / LIANG CHENG et al. | European Patent Office | 2023

    Free access

    Method for installing cable hoisting system of large-span deck type concrete-filled steel tube arch bridge

    ZOU SHUNQUAN / CHEN MINGYANG / WANG MINGSHENG et al. | European Patent Office | 2023

    Free access

    Transportation device and transportation method for arch rib sections of concrete-filled steel tube arch bridge

    MA WENHUI / FU LIUYUAN / WU CHUNHAI et al. | European Patent Office | 2023

    Free access


    Tower crane foundation for steel tube arch bridge and construction method

    LUO XIAOBIN / MA RUIYI / LIU XINGYAN et al. | European Patent Office | 2023

    Free access