The invention provides a working diagram compilation conflict resolution method and device and a storage medium, the method comprises the steps that an event-activity network of a target working diagram is constructed based on arrival and departure moments of trains at stations in the target working diagram, events are arrival events and departure events, and the activity network is activities corresponding to the events; determining a time constraint of each activity; based on the event-activity network of the target working diagram, constructing a to-be-processed event set by taking an arrival event of a first bus of the running line of which the conflict is to be solved at the starting station as a starting point; and when it is confirmed that the run line conflict exists according to the time constraint and the event set, the occurrence time of the event corresponding to the run line conflict is adjusted so as to solve the conflict. According to the method, the running process and the space-time relation of the urban rail transit train are described through the events and the activities, the time constraint is fully considered, the occurrence time of the conflict events is corrected based on the minimum duration limitation of the different activities, the conflict problem in running overshoot is solved, and the mapping efficiency is improved.
本申请提供一种运行图编制冲突解决方法、设备、存储介质,该方法基于目标运行图中各列车在各站点的到发时刻,构建目标运行图的事件‑活动网络,其中,事件为到达事件和发车事件,活动网络为事件对应的活动;确定各活动的时间约束;基于目标运行图的事件‑活动网络,以待解决冲突的运行线的首班车在始发站的到达事件为起点构建待处理的事件集合;根据时间约束和事件集合确认存在运行线冲突时,调整运行线冲突所对应的事件的发生时间,以便解决冲突。本申请以事件和活动来描述城市轨道交路列车运行过程和时空关系,充分考虑了时间约束,基于不同活动最小持续时间限制对冲突事件的发生时间进行修正,解决运行过冲中的冲突问题,提升编图效率。
Operation diagram compiling conflict resolution method and device, and storage medium
运行图编制冲突解决方法、设备、存储介质
2023-03-28
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC / G06Q Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke , DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES |
Train working diagram conflict resolution method and device, equipment and storage medium
European Patent Office | 2023
|Railway working diagram automatic compiling method and system
European Patent Office | 2022
|Subway train operation plan compiling method, medium and system
European Patent Office | 2024
|Airspace conflict resolution method and device, electronic equipment and storage medium
European Patent Office | 2024
|Rail transit working diagram conflict detection method and device
European Patent Office | 2022
|