According to the method for blocking the large breach and the matched single pile and the matched pile group, the single pile and the pile group serve as a main body, a helicopter serves as a carrier, the single pile and the pile group are carried to the position above the breach, and a satellite positioning system is used for conducting accurate positioning air-drop on the single pile or the pile group. The single pile and the pile group are inserted into the breach through energy generated by free falling, the space-air-ground integrated three-dimensional operation mode for blocking the breach is achieved, and safety, efficiency and reliability are achieved.
封堵大型决口的方法及其配套的单桩和群桩,用单桩和群桩作为主体,用直升机作为载体,将单桩和群桩运载到决口的上方,用卫星定位系统对单桩或群桩的精确定位空投。使单桩和群桩利用自由落体所产生的能量插入决口处,实现封堵决口的空天地一体的立体操作模式,安全高效可靠。
Method for blocking large breach and matched single pile and pile group
封堵大型决口的方法及其配套的单桩和群桩
2023-02-10
Patent
Electronic Resource
Chinese
Single-ship double-main-hook pile turning method for large-diameter single pile
European Patent Office | 2023
|Parallel charging pile, parallel charging pile group and interconnection method
European Patent Office | 2023
|Method for pile turning of large-diameter single pile through full-rotation crane ship
European Patent Office | 2021
|Ultra-large type single pile offshore construction method