The invention relates to a locomotive CIR host supporting 5G broadband voice AMR-WB scheduling communication and a scheduling communication method.The CIR host is achieved by replacing a main control unit on an existing CIR host, the CIR host comprises a back plate, the main control unit comprises a bottom plate and a core plate, the core plate is installed on the bottom plate, the bottom plate is connected with the back plate, the bottom plate is provided with an Ethernet port, and the Ethernet port is connected with the core plate. And the CIR host is connected with the 5G communication module through an Ethernet interface to realize 5G broadband voice AMR-WB scheduling communication. Compared with the prior art, the method has the advantages that higher-quality voice communication is provided for the locomotive, the transformation cost is low, convenience and rapidness are achieved, and the universality is high.

    本发明涉及一种支持5G宽带语音AMR‑WB调度通信的机车CIR主机及调度通信方法,其中CIR主机通过在既有CIR主机上更换主控单元实现,CIR主机包括背板,主控单元包括底板和核心板,核心板安装在底板上,底板与背板相连,底板上设有以太网口,CIR主机通过以太网接口与5G通信模块相连,实现5G宽带语音AMR‑WB调度通信。与现有技术相比,本发明具有为机车提供更高质量的语音通信、改造成本低、方便快捷、通用性强等优点。


    Access

    Download


    Export, share and cite



    Title :

    Locomotive CIR host supporting 5G broadband voice AMR-WB scheduling communication and scheduling communication method


    Additional title:

    支持5G宽带语音AMR-WB调度通信的机车CIR主机及调度通信方法


    Contributors:
    XIAO ZHENGJIE (author) / CHEN JIEREN (author) / SUN DI (author)

    Publication date :

    2023-02-07


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    H04W WIRELESS COMMUNICATION NETWORKS , Drahtlose Kommunikationsnetze / B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC



    Locomotive Scheduling Problem

    Vaidyanathan, Balachandran / Ahuja, Ravindra K. | Springer Verlag | 2015


    Locomotive scheduling at the Silvis shops

    Bowes, L.C. / Sandstrom, G.E. / Robinson, H.K. | Engineering Index Backfile | 1923


    Solving Real-Life Locomotive-Scheduling Problems

    Ahuja, R. K. / Liu, J. / Orlin, J. B. et al. | British Library Online Contents | 2005


    Locomotive scheduling at the Silvis shops

    Bowes, L.C. / Sandstrom, G.F. / Robinson, H.K. | Engineering Index Backfile | 1923


    A locomotive repair shop scheduling system

    Gibson, Grant. | Engineering Index Backfile | 1921