The invention discloses a building construction elevator construction layer high-position lifting transportation construction method. The construction method comprises the steps of first-stage construction preparation, lifting type outer frame installation and construction elevator installation; in the second stage, overall lifting pre-operation, overall lifting operation process and lifting in-place operation are carried out; and a third stage of system dismantling process and subsequent construction. The construction elevator and the climbing frame are integrated, the construction elevator can directly reach the top construction face, the use efficiency of the construction elevator is greatly improved, and manpower resources are saved.
本发明公开了一种建筑施工电梯施工层高位提升运输施工方法,施工方法包括:第一阶段施工准备、提升式外架安装、施工电梯安装;第二阶段整体提升前操作、整体提升操作过程、和提升就位操作;第三阶段系统拆除流程和后续施工。本发明通过将施工电梯与爬架一体化,施工电梯可以直接到达顶层施工面,大大提高了施工电梯的使用效率,节约了人力资源。
Building construction elevator construction layer high-position lifting transportation construction method
一种建筑施工电梯施工层高位提升运输施工方法
2023-02-03
Patent
Electronic Resource
Chinese
IPC: | B66B Aufzüge , ELEVATORS |
Elevator for building construction and lifting method thereof
European Patent Office | 2023
|Vertical transportation lifting equipment for building construction
European Patent Office | 2023
|