The invention discloses a split ship superstructure installation structure and method and a split ship. The split ship superstructure installation structure comprises a superstructure, a first connecting assembly and a second connecting assembly, and the first connecting assembly comprises a first hinge structure and a second hinge structure; the first hinge structure comprises a first mounting support, a second mounting support and a hinge connecting rod, the first mounting support is hinged to the hinge connecting rod, the second mounting support is hinged to the hinge connecting rod, the second hinge structure comprises a third mounting support and a fourth mounting support, and the third mounting support is hinged to the fourth mounting support; the second connecting assembly comprises a third hinge structure, the third hinge structure comprises a fifth mounting support and a sixth mounting support, and the fifth mounting support is hinged to the sixth mounting support. According to the invention, relative rotation is generated between the first mounting support and the hinge connecting rod and between the second mounting support and the hinge connecting rod, and the hinge connecting rod balances mutual pulling of the first hinge structures, so that the superstructure is stable.
本发明公开了一种开体船上层建筑安装结构、安装方法及开体船,开体船上层建筑安装结构包括上层建筑、第一连接组件、第二连接组件,第一连接组件包括第一铰链结构、第二铰链结构,第一铰链结构包括第一安装支座、第二安装支座、铰链连杆,第一安装支座与铰链连杆铰接,第二安装支座与铰链连杆铰接,第二铰接结构包括第三安装支座、第四安装支座,第三安装支座与第四安装支座铰接;第二连接组件包括第三铰链结构,第三铰链结构包括第五安装支座、第六安装支座,第五安装支座与第六安装支座铰接。本发明中,第一安装支座、第二安装支座分别与铰接连杆之间产生相对转动,铰链连杆平衡各第一铰链结构的相互拉扯,从而使上层建筑平稳。
Mounting structure and mounting method for upper layer building of split ship and split ship
一种开体船上层建筑安装结构、安装方法及开体船
2023-01-13
Patent
Electronic Resource
Chinese
IPC: | B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS |