The invention relates to a high-rise building outer wall tiling hoisting auxiliary device and belongs to the technical field of hoisting. A vertical supporting beam is arranged at the right end of a bottom supporting seat, a cross beam support is arranged on the upper middle portion of the vertical supporting beam, an inclined supporting beam is arranged at the left end of the cross beam support, and the right end of the inclined supporting beam is connected with the top of the vertical supporting beam; a vertical auxiliary beam is arranged at the left end of the bottom supporting seat through bolts, the upper end of the vertical auxiliary beam is connected with the cross beam in a supporting mode through bolts, moving wheels are arranged on the lower portion of the vertical auxiliary beam, the moving wheels on the two sides are connected through a U-shaped frame, and a steel wire winder driven by a motor is fixedly arranged at the bottom of the U-shaped frame. A lifting hook is arranged below the steel wire connector and connected with an arc-shaped hole in the upper portion of the fixed supporting plate through a lifting rope, iron chain fixers are arranged on the left side and the right side of the bottom of the fixed supporting plate through arc-shaped bases and bolts, lifting iron chains and chain protection baffles are arranged at the bottoms of the iron chain fixers, and ceramic tile containing fences are arranged at the bottoms of the lifting iron chains.

    本发明涉及一种高层建筑外墙贴砖吊运辅助装置,属于吊运技术领域,所述的底部支撑座的右端设有立式支撑梁,立式支撑梁中上部设有横梁支撑,横梁支撑的左端设有斜向支撑梁,斜向支撑梁的右端与立式支撑梁的顶部连接,底部支撑座的左端通过螺栓设有立式辅助梁,立式辅助梁的上端通过螺栓与横梁支撑连接,立式辅助梁下部设有移动轮,两侧移动轮通过U形框连接,U形框底部固定设有带电机驱动的钢丝卷绕器,钢丝卷绕器内钢丝绳下方设有钢丝连接器,钢丝连接器的下方设有吊钩,吊钩通过吊绳与固定支撑板上方的弧形孔连接,固定支撑板的底部左右侧通过弧形座和螺栓设有铁链固定器,铁链固定器的底部设有吊运铁链和护链挡板,吊运铁链的底部设有瓷砖放置栏。


    Access

    Download


    Export, share and cite



    Title :

    High-rise building outer wall tiling hoisting auxiliary device


    Additional title:

    一种高层建筑外墙贴砖吊运辅助装置


    Contributors:
    MIAO HUADONG (author) / HAN PING (author) / YAO JIUGANG (author) / SHA JUN (author) / ZHAN ZIRUI (author)

    Publication date :

    2022-11-15


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66C Krane , CRANES / B66D Haspeln , CAPSTANS



    High-rise building glass curtain wall hoisting equipment and hoisting method thereof

    WANG BAIZHANG / SU GANG | European Patent Office | 2020

    Free access

    Outer wall hoisting safety device

    DENG HAIQING | European Patent Office | 2021

    Free access

    High-rise hoisting device for high-rise building construction

    HUANG SHUN / XU XIAOTING / CHEN HONGWEI et al. | European Patent Office | 2023

    Free access

    Hoisting system for glass curtain wall of high-rise building

    WU FAN / HUO XIANGMING | European Patent Office | 2020

    Free access

    Auxiliary hoisting device for ultra-high-rise climbing formwork

    ZHAO QIAN | European Patent Office | 2020

    Free access