The invention discloses an integrated operation progress monitoring system for a railway passenger whole station, and the system comprises an operation task module which is used for storing the information of a train for arranging an operation task of the passenger whole station on that day; the train state monitoring module is connected to the operation task module so as to monitor the train warehousing state; the work order operation module is connected to the operation task module to obtain a task item set; the wireless communication module is used for obtaining operation item information; the operation progress monitoring module is connected to the operation task module and the work order operation module, and is used for acquiring a current dispatched task item set and starting to time the dispatched task items; and the control module is used for comparing the total used time of the task item set with the total dispatch time length to obtain the operation progress. According to the system disclosed by the invention, the train warehousing information is sent to the operation progress monitoring terminal and the work order operation terminal in real time after the train is warehoused, so that scheduling and field operation personnel can conveniently master the operation warehousing state in real time and arrange servicing and maintenance operation in time.
本发明公开一种铁路客整所一体化作业进度监控系统,包括:作业任务模块,用于保存客整所当日安排作业任务的列车信息;列车状态监控模块,连接于作业任务模块以监控列车入库状态;工单作业模块,连接于作业任务模块,获得任务项集合;无线通信模块,用于获得作业项信息;作业进度监测模块,连接于作业任务模块和工单作业模块,用于获取当前已派工任务项集合并对已派工任务项开始进行计时;控制模块,控制模块对任务项集合总用时与总派工时长求比,获得作业进度。本发明所述系统,列车入库后实时向作业进度监控终端以及工单作业终端发送列车入库信息,方便调度和现场作业人员实时掌控作业入库状态及时安排整备检修作业。
Railway passenger whole station integrated operation progress monitoring system
铁路客整所一体化作业进度监控系统
2022-03-11
Patent
Electronic Resource
Chinese
IPC: | B61L Leiten des Eisenbahnverkehrs , GUIDING RAILWAY TRAFFIC |
Optimal operation scheduling and platform track assignment in a passenger railway station
Online Contents | 2014
|