The invention discloses a segmented integral lifting installation construction method for a large dense pipeline system, belongs to the technical field of building construction, and aims to solve the technical problems of how to meet the installation requirements of parts with insufficient operation space, simplify the construction process and shorten the construction period. According to the technical scheme, the method specifically comprises the following steps: S1, detailed design of BIM modeling; S2, prefabricating and blanking in a factory; S3, material approach; S4, installation of embedded parts of a dense pipeline support; S5, Layered installing and welding of mounting of a pipeline system support and a pipeline; and S6, segmented integral lifting installation of the dense pipeline system.
本发明公开了一种大型密集管道系统分段整体提升安装施工方法,属于建筑施工技术领域,本发明要解决的技术问题为如何满足操作空间不足的部位安装要求,简化施工工艺,缩短施工工期,采用的技术方案为:该方法具体如下:S1、BIM建模深化设计;S2、工厂预制下料;S3、材料进场;S4、密集管道支架预埋件安装;S5、管道系统支架与管道分层安装焊接;S6、密集管道系统分段整体提升安装。
Segmented integral lifting installation construction method for large dense pipeline system
一种大型密集管道系统分段整体提升安装施工方法
2021-11-30
Patent
Electronic Resource
Chinese
Segmented lifting type construction elevator mechanism and segmented lifting method thereof
European Patent Office | 2016
|Building installation engineering pipeline installation lifting equipment
European Patent Office | 2024
|Pipeline installation vehicle with lifting arm and lifting platform
European Patent Office | 2022
|