The invention relates to a method for integrally hoisting a high-voltage post insulator. The method comprises the steps of determining a hoisting tool, installing a grading ring, installing a U-shaped ring, assembling the hoisting tool and integrally hoisting the high-voltage post insulator. The problems of high labor intensity and low working efficiency caused by section-by-section hoisting and high safety risk caused by high-altitude operation in the existing construction method are effectively solved, and the high-voltage post insulator can be safely, reliably and efficiently mounted or dismounted integrally.
本发明涉及一种整体吊装高压支柱绝缘子的方法,包括吊具确定、安装均压环、安装U型环、吊具组装、整体吊装高压支柱绝缘子。本发明有效解决了现有施工方法由于逐节起吊带来劳动强度大、工作效率低下及高处作业带来安全风险高等问题,确保安全、可靠、高效地整体安装或拆除高压支柱绝缘子。
Method for hoisting high-voltage post insulator
一种吊装高压支柱绝缘子的方法
2021-11-09
Patent
Electronic Resource
Chinese