The invention discloses a corridor suspended ceiling mounting plate hoisting structure and a construction method thereof, and relates to the technical field of building construction. The corridor suspended ceiling mounting plate hoisting structure comprises a first tower, a second tower and a corridor connected between the first tower and the second tower, supporting steel beams are arranged at the two ends of the top of the corridor correspondingly, and two winches are arranged at the tops of the two supporting steel beams correspondingly. A steel truss is arranged on one side of the bottom of the corridor, the four sets of winches are connected with the four corners of the steel truss through lifting steel wire ropes, and cable-stayed steel wire rope mechanisms connected with the steel truss are obliquely arranged at the four corners of the bottom of a bottom steel structure beam. According to the corridor suspended ceiling mounting plate hoisting structure and the construction method thereof, the steel truss is hoisted through the multiple sets of winches, then an aluminum plate needing to be installed is placed on the top of the steel truss to be hoisted, the bottom of the whole corridor is divided into four construction stages, the positions for hoisting the aluminum plate are replaced through transverse movement of the winches, the overall high-altitude aluminum plate installation difficulty is greatly reduced, installation is convenient, and the safety coefficient is high.

    本发明公开了一种连廊吊顶安装板吊装结构及其施工方法,涉及建筑施工技术领域,包括第一塔楼和第二塔楼以及其中间连接的连廊,所述连廊顶部两端皆设置有支撑钢梁,两组所述支撑钢梁顶部分别设置有两组卷扬机,所述连廊底部一侧设置有钢桁架,四组所述卷扬机和钢桁架四角处皆通过起吊钢丝绳连接,所述底部钢结构梁底部四角处皆倾斜设置有与钢桁架相连接的斜拉钢丝绳机构。本发明通过多组卷扬机吊装钢桁架,然后将需要安装的铝板放置在钢桁架顶部进行吊装,且整体连廊底部分为四个施工阶段,通过卷扬机的横向移动更换吊装铝板的位置,本发明整体对高空中铝板安装难度大大降低,且安装起来较为方便,安全系数较高。


    Access

    Download


    Export, share and cite



    Title :

    Corridor suspended ceiling mounting plate hoisting structure and construction method thereof


    Additional title:

    一种连廊吊顶安装板吊装结构及其施工方法


    Contributors:

    Publication date :

    2021-09-24


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    Chinese


    Classification :

    IPC:    B66F HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD , Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last / E04G SCAFFOLDING , Baugerüste



    Slidable hoisting device for suspended ceiling plate at bottom of high-altitude steel corridor

    CUI DONGYUE / QIANG ANPENG / GUO ZHENZHI et al. | European Patent Office | 2024

    Free access

    Aerial corridor curtain wall suspended ceiling aluminum plate lifting device

    YU ZHAOBO / LI WENHU / CUI LEILEI et al. | European Patent Office | 2022

    Free access


    Suspended ceiling installation construction method for ultra-large-span heavy steel corridor

    LIANG HOUZUN / PENG WEIYUAN / LI JINGFENG | European Patent Office | 2024

    Free access

    Fabricated suspended ceiling and mounting method thereof

    ZHOU YUPENG / WANG JIAWEI / ZHOU JIANJUN | European Patent Office | 2024

    Free access