The invention relates to a large transformer installation and construction method, which adopts a large transformer installation and construction device. The large transformer installation and construction device comprises a telegraph pole, a bearing block, an installation frame, a large transformer, a fixing mechanism, a hoisting mechanism and a jack mechanism. According to the large transformer installation and construction method provided by the invention, the installation frame and the fixing mechanism are combined for use, so that the stress point is located at the center position when a large transformer is hoisted, hoisting stress is uniform, hoisting of the large transformer is facilitated, and the occurrence of the phenomenon of hoisting inclination caused by the fact that the large transformer is not fixed in place in the hoisting process of the large transformer is avoided; and meanwhile, the large transformer is at a straight rising state when being hoisted, so that the occurrence of the phenomenon of installation deviation is avoided, and meanwhile, the phenomenon that the large transformer shakes in the air after being lifted is avoided.
本发明涉及一种大型变压器安装施工方法,其使用了一种大型变压器安装施工装置,该大型变压器安装施工装置包括电线杆、承重块、安装架、大型变压器、固定机构、吊装机构和起重机构,本发明采用的安装架与固定机构相结合使用,使得大型变压器提升时受力点在中心位置,提升受力均匀,便于对大型变压器的提升,避免出现大型变压器提升的过程中因大型变压器的固定不到位导致的提升倾斜现象,同时大型变压器进行吊装时是直线上升状态,避免出现安装偏移的现象,同时避免了将大型变压器起吊之后在空中晃动的现象。
Large transformer installation and construction method
一种大型变压器安装施工方法
2021-07-06
Patent
Electronic Resource
Chinese
Transformer installation structure and construction method thereof
European Patent Office | 2021
|Installation and construction method for transformer tower type equipment
European Patent Office | 2025
|Installation construction device for electric power engineering transformer
European Patent Office | 2024
|Automatic transformer installation equipment and installation method
European Patent Office | 2024
|