The invention discloses a variable cross-section track system curtain wall installation construction method. The construction method comprises the steps of construction preparation, material entering the field, guide rail installation, trial operation, curtain wall hoisting, inspection and acceptance and track dismounting, after the construction method is adopted, an operator does not need to excessively approach the edge for operation, so that the falling risk is reduced, by utilizing the advantage of high lifting speed of a winch, unit type curtain wall plates are lifted to installation positions and converted to a track of a track system, an electric hoist erected on the track is used for in-place installation, the electric hoist on the track can freely move on the track, so that the problem that a traditional lifting process machine tool needs to move once every time one plate is installed is solved, convenience and rapidness are achieved, the construction efficiency is improved, and the curtain walls are stacked at ground hoisting points of the track system after entering the field, and are subsequently and orderly mounted and circularly lifted in the subsequent process, and curtain wall plates do not need to be carried and transferred for multiple times, so that the workload of workers is relatively small.
本发明公开了一种变截面轨道系统幕墙安装施工方法,施工方法包括施工准备、材料进场、导轨安装、试运行、幕墙吊装、检查验收、轨道拆除,采用本发明的施工方法后,操作人员不需过度靠近临边操作,降低坠落风险,利用卷扬机提升速度快的优势,将单元式幕墙板块提升到安装位置,转换到轨道系统轨道,利用架设于轨道的电葫芦进行就位安装,轨道上的电葫芦可以在轨道上自由移动,解决了传统提升工艺机具每安装一板块需移动一次的问题,方便快捷,提高施工效率,幕墙进场后,将其堆放于轨道系统地面吊装点,后续依次有序安装,循环升降,无需多次搬运转移幕墙板块,工人工作量较小。
Variable cross-section track system curtain wall installation construction method
一种变截面轨道系统幕墙安装施工方法
2021-04-09
Patent
Electronic Resource
Chinese
IPC: | E04B Allgemeine Baukonstruktionen , GENERAL BUILDING CONSTRUCTIONS / B66C Krane , CRANES / B66F HOISTING, LIFTING, HAULING, OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD , Hub-, Verhol- oder Schubvorrichtungen, soweit nicht anderweitig vorgesehen, z.B. Vorrichtungen mit unmittelbarer Krafteinwirkung auf die Last / E04G SCAFFOLDING , Baugerüste |
Glass curtain wall hoisting device for variable cross-section super high-rise track system
European Patent Office | 2024
|European Patent Office | 2024
|Curtain wall hoisting device and installation construction method thereof
European Patent Office | 2023
|Glass installation auxiliary device for glass curtain wall construction
European Patent Office | 2022
|