The invention provides a double-station synchronized double-hoisting-point hoisting device for a bridge, relates to the field of hoisting devices, and solves the problems that wire rope lubrication and automatic addition of lubricating structure oil cannot be automatically realized in the use process; a hoisting structure cannot realize elastic buffering, the fatigue of the hoisting structure is easily enhanced due to overlarge impact force in the hoisting stage, and the elastic self-enhancement of an elastic buffering structure cannot be realized through structural improvement. The double-station synchronized double-hoisting-point hoisting device for the bridge comprises a frame body and a hanging seat, wherein the frame body is of a U-shaped structure, and an adjusting structure is arranged on the frame body. Due to the fact that two shifting arms are symmetrically welded to the hanging seat and are aligned with two elastic sprinklers respectively, when the shifting arms move upwardsby 10 m along with the hanging seat, the shifting arms make contact with the elastic sprinklers, and at the moment, the elastic sprinklers are in an extrusion sprinkling state.
本发明提供一种双工位同步进行的桥梁双吊点吊装装置,涉及吊装装置领域,解决了一个是,不能够在使用过程中自动实现钢丝绳润滑以及润滑结构油料的自动添加;悬挂结构不能够实现弹性缓冲,在起吊阶段悬挂结构因冲击力过大容易导致疲劳度增强,且不能够通过结构改进实现弹性缓冲结构的弹力自我增强的问题。一种双工位同步进行的桥梁双吊点吊装装置,包括架体和悬吊座;所述架体为“凹”形结构,且架体上安装有调整结构。因悬吊座上对称焊接有两个拨动臂,且两个拨动臂分别与两个弹性喷壶对正,当拨动臂跟随悬吊座向上移动10m时与弹性喷壶接触,此时弹性喷壶处于挤压喷洒状态。
Double-station synchronized double-hoisting-point hoisting device for bridge
一种双工位同步进行的桥梁双吊点吊装装置
2020-12-04
Patent
Electronic Resource
Chinese
Hoisting system of single-drum double-hoisting-point ladle crane
European Patent Office | 2020
|DOUBLE HOISTING CONTROL DEVICE FOR HOISTING MACHINE AND LIFTING DEVICE FOR HOISTING MACHINE
European Patent Office | 2018
|Hoisting method for hoisting steel truss bridge by using double floating cranes
European Patent Office | 2024
|