The invention relates to a tower crane full-formwork building construction method. The tower crane full-formwork building construction method comprises the following steps that S1, geological survey is conducted; S2, a building drawing and a pouring formwork drawing are designed; S3, foundation construction is conducted; S4, a column beam and a floor slab are built; S5, wall formworks are assembled to form a wall full formwork of a single-layer floor; S6, a tower crane is built; S7, the wall full formwork is hoisted to the construction floor and installed; S8, a wall is poured, and wall cementis maintained; and S9, the wall full formwork is dismantled. The tower crane full-formwork building construction method has the effect of being high in construction efficiency, and the construction period is shortened.
本发明涉及一种塔吊全模建筑施工方法,包括如下步骤:S1、地质勘察;S2、设计建筑图纸以及浇筑模板图纸;S3、地基施工;S4、建造柱梁和楼板;S5、拼装墙体模板,组成单层楼层的墙体全模;S6、搭建塔吊;S7、吊装所述墙体全模至施工楼层并安装墙体全模;S8、浇筑墙体并养护墙体水泥;S9、拆除墙体全模。本发明具有施工效率高的效果,缩短了施工周期。
Tower crane full-formwork building construction method
一种塔吊全模建筑施工方法
2020-08-07
Patent
Electronic Resource
Chinese
Full-automatic tower column building device and tower crane building method thereof
European Patent Office | 2023
|Building construction tower crane collision avoidance method
European Patent Office | 2021
|