The invention discloses a method of quickening an elevator installation schedule and a check and acceptance schedule. The method comprises the following structures: simple elevator pit steel buffering piers, a waterproof platform special for elevator machine room steel wire rope holes and a small door pocket suitable for an elevator, wherein the buffering piers are arranged on a buffering bottom plate, and the buffering piers are fixedly connected with the buffering bottom plate; the waterproof platform consists of two n-shaped frames; a bottom plate is arranged on the lower part of each n-shaped frame; fixed holes are formed in the bottom plates; screwing plates are mounted at the corresponding installing positions of the two n-shaped frames; screw holes are formed in the screwing plates; two ends of each door pocket plate are respectively provided with connection plates; screw holes are formed in the connection plates; and the included angle of each door pocket plate and the corresponding connection plate is greater than 90 degrees. The method of quickening an elevator installation schedule and a check and acceptance schedule has the advantages that the structure is reasonable; the check and acceptance standards of the elevator can be rapidly met; the check and acceptance efficiency and installation efficiency of the elevator are improved; and manpower and material resources are greatly saved.
Method of quickening elevator installation schedule and check and acceptance schedule
2016-01-06
Patent
Electronic Resource
English
IPC: | B66B Aufzüge , ELEVATORS |
SCHEDULE GUIDE DEVICE, SCHEDULE GUIDE METHOD AND SCHEDULE GUIDE PROGRAM
European Patent Office | 2017
|Appointment and schedule control system used for building elevator
European Patent Office | 2016
|Wiley | 2023
|