The invention discloses a hoisting method of a gas pipeline in an external wall of a super high-rise building. The hoisting method comprises the following steps: manufacturing and mounting a temporary construction platform at the bottom of a hoisting region; manufacturing and mounting zig-zag mast hoisting equipment through a roof platform of the building; mounting a fixed bracket for lifting a hoisting basket through the roof platform of the building; mounting the gas pipeline and a gas pipeline bracket from bottom to top; hoisting constructors to a corresponding position at which the gas pipeline bracket needs to be mounted of the external wall through the hoisting basket, and mounting the gas pipeline bracket by the constructors; hoisting the gas pipeline to be mounted to a corresponding mounting position of the external wall of the building through the zig-zag mast hoisting equipment, and embedding the gas pipeline to be mounted into the mounted gas pipeline bracket; and welding the gas pipeline and the lower mounted gas pipeline by the constructors. According to the hoisting method disclosed by the invention, the gas pipeline can be efficiently hoisted on the external wall of the super high-rise building and can be efficiently mounted in the external wall of the super high-rise building.
Hoisting method of gas pipeline in external wall of super high-rise building
2015-11-25
Patent
Electronic Resource
English
Hoisting method of super high-rise building curtain wall unit plate
European Patent Office | 2023
|Irregular facade super high-rise building unit type curtain wall hoisting system
European Patent Office | 2023
|European Patent Office | 2023
|