A coiled tubing deployment system includes an offshore rig having a reel positioned thereon and coiled tubing wound on the reel. A guide arch is positioned on the offshore rig to receive the coiled tubing from the reel, and a tubing guide receives the coiled tubing from the guide arch and directs the coiled tubing into water. A depth counter measures a length of the coiled tubing deployed from the reel and generate one or more length measurement signals, and a set of bend sensors is positioned on the tubing guide to measure real-time strain assumed by the coiled tubing as deployed into the water and thereby generate one or more bend sensor signals. A data acquisition system receives the length measurement signals and the bend sensor signals and provides an output signal indicative of real-time bending fatigue of the coiled tubing at select locations along the coiled tubing.

    L'invention concerne un système de déploiement de tube spiralé comprenant une plate-forme de forage en mer sur laquelle est positionnée un dévidoir et le tube spiralé est enroulé sur le dévidoir. Un arc de guidage est positionné sur la plate-forme de forage en mer pour recevoir le tube spiralé depuis le dévidoir, et un guide de tube reçoit le tube spiralé depuis l'arc de guidage et dirige le tube spiralé dans l'eau. Un compteur de profondeur mesure une longueur du tube spiralé déployé à partir du dévidoir et génère un ou plusieurs signaux de mesure de longueur, et un ensemble de capteurs de flexion est positionné sur le guide de tube pour mesurer en temps réel l'effort supporté par le tube spiralé à mesure de son déploiement dans l'eau et générer ainsi un ou plusieurs signaux de capteur de flexion. Un système d'acquisition de données reçoit les signaux de mesure de longueur et les signaux de capteur de flexion et délivre un signal de sortie indicatif de la fatigue de flexion en temps réel du tube spiralé à des emplacements choisis le long du tube spiralé.


    Access

    Download


    Export, share and cite



    Title :

    REAL-TIME TRACKING OF BENDING FATIGUE IN COILED TUBING


    Additional title:

    LOCALISATION EN TEMPS REEL DE LA FATIGUE DE FLEXION DANS UN TUBE SPIRALE


    Contributors:

    Publication date :

    2019-08-27


    Type of media :

    Patent


    Type of material :

    Electronic Resource


    Language :

    English


    Classification :

    IPC:    B63B Schiffe oder sonstige Wasserfahrzeuge , SHIPS OR OTHER WATERBORNE VESSELS / E21B EARTH OR ROCK DRILLING , Erd- oder Gesteinsbohren



    Real-Time tracking of bending fatigue in coiled tubing

    ALAN CHARLES JOHN TURNER / RICHARD IAN GILLINGS / ANNA SAVENKOVA | European Patent Office | 2017

    Free access

    Real-time tracking of bending fatigue in coiled tubing

    TURNER ALAN CHARLES JOHN / GILLINGS RICHARD IAN / SAVENKOVA ANNA | European Patent Office | 2017

    Free access

    REAL-TIME TRACKING OF BENDING FATIGUE IN COILED TUBING

    TURNER ALAN CHARLES JOHN / GILLINGS RICHARD IAN / SAVENKOVA ANNA | European Patent Office | 2016

    Free access

    Real-time tracking and mitigating of bending fatigue in coiled tubing

    TURNER ALAN CHARLES JOHN / GILLINGS RICHARD IAN / COOPER GEORGE STEWART et al. | European Patent Office | 2017

    Free access

    REAL-TIME TRACKING AND MITIGATING OF BENDING FATIGUE IN COILED TUBING

    TURNER ALAN CHARLES JOHN / GILLINGS RICHARD IAN / COOPER GEORGE STEWART et al. | European Patent Office | 2016

    Free access