Manufacturing a wide range of advanced light-alloy forgings and pressings from wing spars of 10ft to model connecting rods lin. long, and all to stringent AID inspection standards, the Redditch works of High Duty Alloys Ltd required two heat treatment furnaces. These had to provide temperature control to an accuracy of ±2°C throughout the heating chamber. Also the discharge time, the time from when the furnace roof starts to lift until the charge is submersed in the quench tank, had to be kept to a minimum to avoid any adverse effect.


    Access

    Check access

    Check availability in my library

    Order at Subito €


    Export, share and cite



    Title :

    Increasing efficiency



    Publication date :

    1972-04-01


    Size :

    1 pages




    Type of media :

    Article (Journal)


    Type of material :

    Electronic Resource


    Language :

    English



    Increasing efficiency

    Emerald Group Publishing | 1973


    Increasing efficiency

    Emerald Group Publishing | 1973


    Increasing efficiency

    Emerald Group Publishing | 1972


    Increasing efficiency

    Emerald Group Publishing | 1972


    Increasing efficiency

    Emerald Group Publishing | 1972