The main hydraulic components, contracted to Sunstrand Corporation in 1967 were carried out in two phases. First there were the rig units, so designated because they were used for Iron Bird and aircraft component testing only. Secondly there were the prototype units which have been flown in the three aircraft.
The main hydraulic components
Aircraft Engineering and Aerospace Technology ; 45 , 7 ; 28-31
1973-07-01
4 pages
Article (Journal)
Electronic Resource
English
VAK 191B - the main hydraulic components
Tema Archive | 1973
Main-line diesel-hydraulic locomotives
Engineering Index Backfile | 1962