Railroad line change eliminates 10 of 11 grade crossings on heavily traveled road between Eugene and Springfield, Ore; remaining crossing is bridged by temporary timber structure, and highway approaches on both sides of bridge are graded and paved; additional improvements have been postponed until after war.
Railroad relocation clears way for Oregon highway improvement
Construction Methods
Construction Methods and Equipment ; 25 , n 4
1943
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pennsylvania railroad relocation
Engineering Index Backfile | 1947
National Highway System Bill Clears House
Online Contents | 1994
Monorail railroad clears track for in-process engines
Engineering Index Backfile | 1967
|Springfield Railroad Relocation Project
British Library Conference Proceedings | 1996
|