In order to dry up and repair lining of 7500-ft brick lined tunnel at Baltimore, to eliminate formation of icicles during winter and permit electric train operation, 9-car, self-contained gunite train was used to carry out work, without interfering with traffic; problems encountered in maintaining equipment to full efficiency under existing conditions.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Large scale operations speed tunnel relining project


    Additional title:

    Ry Eng Maintenance


    Published in:

    Publication date :

    1936


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Relining the Mauvages Tunnel on the Marne Ship Canal

    Mann, Francis B. | Engineering Index Backfile | 1913


    Relining engine bearings

    Bourdon, M.W. | Engineering Index Backfile | 1942


    Hausanschlußsanierung mittels PE-Rohr-Relining

    Karow, U. / Körber, J. | Tema Archive | 1996


    A Low-Pressure Cold-Relining Table

    Mehra, V. R. / National Maritime Museum (Great Britain) | British Library Conference Proceedings | 2003