To renew air in headings during construction, two Sulzer fans were installed, driven by 125-hp motors and working in series; fresh air was led to headings and to lateral and upper works by pipes 2 ft and 3 1/4 ft in diam.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Ventilating plant of Sainte-Marie railway tunnel on line between Saint-Die and Sainte-Marie-Aux-mines in the vosges


    Additional title:

    Sulzer Tech Rev


    Published in:

    Publication date :

    1936


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Sainte-Marie de Souillac

    Pradalier, H. / Societe Francaise d'Archeologie | British Library Conference Proceedings | 1993


    L'abbatiale Sainte-Marie de Cruas

    Tardieu, J. / Hartmann-Virnich, A. / Societe francaise d'archeologie | British Library Conference Proceedings | 1995


    The new ship canal and locks at Sault Sainte Marie

    Mills, James Cooke | Engineering Index Backfile | 1911


    The Ring Road of Oloron Sainte Marie: Good Traffic Flow and Daily Life

    Panerai, P. | British Library Conference Proceedings | 1997