Chicago and North Western has devised combination of automatic and manual controls, with selective speed control, switching cut-outs, and key controllers to solve local problem at Crystal Lake, Ill; manual control machine is in elevated cabin; traffic includes about 30 trains daily, while 45 to 50 switching moves are made over these three crossings daily.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Gates at three crossings


    Additional title:

    Ry Signaling Communications



    Publication date :

    1953


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Gates at three crossings on C. and N.W.

    Engineering Index Backfile | 1943


    Gates at seven alton grade crossings

    Engineering Index Backfile | 1940


    Gates at seven alton grade crossings

    Engineering Index Backfile | 1940


    MONITORING OF BARRIER GATES AT LEVEL CROSSINGS

    PIPARSANIYA HARSH | European Patent Office | 2022

    Free access

    Gates at crossings of railways and roads

    Sto¨ / cke, Karl | Engineering Index Backfile | 1902