Planning of system claimed to be largest and most up-to-date on European continent; CTC area is ultimately to encompass 22 interlockings located within close-knit network of connecting tracks within radius of about 7 mi around central station; automatic route setting made possible by train number indicator system.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Junction interlocking at Frankfort's central railroad station


    Additional title:

    Siemens Rev


    Contributors:

    Published in:

    Siemens Review ; 28 , n 1


    Publication date :

    1961


    Size :

    7 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Central interlocking system in Munich central railroad terminal

    Deike, H. / Trippler, K. | Engineering Index Backfile | 1964




    Interlocking system of railroad signals

    Engineering Index Backfile | 1889


    Interlocking system of railroad signals

    Engineering Index Backfile | 1890