Standard ship produced at Warnemuende shipyard, on Baltic coast of East Germany, is 10,000 ton tanker or general purpose vessel; 4 ships at time are dealt with progressively; prefabrication hall can handle sections up to 54 tons; progressive method is also applied to 4 ships in fitting out basin; ships under construction include 9000 ton freighters for Soviet Union.
Productivity in East German shipyard
Engineering
Engineering ; 192 , n 4971
1961
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2012
Productivity boost at Guangzhou Shipyard
Online Contents | 1998
Updated equipment key to shipyard productivity
Tema Archive | 2003
Improving shipyard productivity with modern shiplift systems
Tema Archive | 1984
Rautaruukki develops techniques to aid shipyard productivity
Tema Archive | 1989