National Ship Hydrodynamics Laboratory at Feltham, England, was opened in Oct 19 1959; laboratory comprises towing tank with dimensions of 1300 ft by 48 ft by 25 ft, water tunnel with measuring section 44 in. in diam, sea keeping and maneuvering basin 100 ft sq, together with necessary workshops for making model hulls and propellors, vibration laboratory, and instrument laboratories for development, testing and calibration. (See also Shipbldr and Mar EngineBldr v 66 n 623 Dec 1959 p 660-2; Mar Engr and Naval Architect v 82 n 1000 Nov 1959 p 392-7)
Ship Hydrodynamics Laboratory
Am Soc Naval Engrs -- J
1960
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1959
Engineering Index Backfile | 1959
New ship-hydrodynamics laboratory
Engineering Index Backfile | 1959
|New ship-hydrodynamics laboratory
Engineering Index Backfile | 1959
|Ship hydrodynamics laboratory for N.P.L
Engineering Index Backfile | 1957
|