Construction of final section of six lane Schuylkill Expressway in Philadelphia; expressway passes under Broad Street and two-track subway in 46 ft depth under street level; installation of temporary and permanent supports for subway roof, 7 ft of fill above roof, and live loads of street traffic; expressway section is flanked by concrete retaining walls.
Highway burrows beneath subway tracks
Eng News -- Rec
Engineering News-Record ; 165 , n 2
1960
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Underpinning railway tracks for subway crossing
Engineering Index Backfile | 1928
|THE SMART CONTROLLING SYSTEM OF OPERATION OF SUBWAY USING EVACUATION TRACKS
European Patent Office | 2021
|THE SMART CONTROLLING SYSTEM OF OPERATION OF SUBWAY USING EVACUATION TRACKS
European Patent Office | 2021
Optical loop data highway for subway power control system
Tema Archive | 1982
|Highway added to Quebec bridge between railway tracks
Engineering Index Backfile | 1930
|