Aug p 1042-4. Hydrological and water-balance conditions of country; water power potential is 31,500 Mw of which 13,300 Mw can be utilized; installed power is at present only 240 Mw, comprising several small, low-head plants; future installations and planned irrigation projects; short description of river port structure at Zeran and lock structure on Laczany canal, both under construction.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Review of hydro-engineering development in Poland


    Additional title:

    Civ Eng (Lond)


    Contributors:

    Published in:

    Civil Engineering (London) ; 55 , n 648 ; p 925-928


    Publication date :

    1960


    Size :

    4 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English