Design and construction of steel girder bridge, by Federal Railroads of Switzerland, consisting of seven 24-m. spans, to take place of old covered wooden bridge which served railroad for 70 years; description of state of timber, particularly joints, bolts, etc., of bridge after 70 years' service; timber bridge will be salvaged to serve as highway bridge in other locality. (See also - nos. 21, 22 and 23, May 26, June 2 and 1928, pp. 253-257 and 271-275, 27 figs)
Construction of new railroad bridge over the Rhine at Ragaz
Der Umbau der Eisenbahnbruecke der S.B.B. ueber den Rhein bei Ragaz
Schweizerische Bauzeitung ; 91 , n 23
1928
2 pages
5 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1945
|Raising the railroad bridge over the rhine between buchs and Schaan
Engineering Index Backfile | 1928
|Railway bridge over Rhine at Spyck
Engineering Index Backfile | 1945
Bus: Omnibus in Kundenhand - Neoplan N 4009 in Bad Ragaz
Online Contents | 1995