Design and construction of steel girder bridge, by Federal Railroads of Switzerland, consisting of seven 24-m. spans, to take place of old covered wooden bridge which served railroad for 70 years; description of state of timber, particularly joints, bolts, etc., of bridge after 70 years' service; timber bridge will be salvaged to serve as highway bridge in other locality. (See also - nos. 21, 22 and 23, May 26, June 2 and 1928, pp. 253-257 and 271-275, 27 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Construction of new railroad bridge over the Rhine at Ragaz


    Additional title:

    Der Umbau der Eisenbahnbruecke der S.B.B. ueber den Rhein bei Ragaz


    Contributors:
    Buehler, A. (author)

    Published in:

    Publication date :

    1928


    Size :

    2 pages


    Remarks:

    5 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    German




    Railroad over Rhine

    Phillips, E.J. | Engineering Index Backfile | 1945


    Railroad over Rhine

    Phillips, E.J. | Engineering Index Backfile | 1945


    Raising the railroad bridge over the rhine between buchs and Schaan

    Kaiser, R. | Engineering Index Backfile | 1928


    Railway bridge over Rhine at Spyck

    Engineering Index Backfile | 1945