Saves contractors long haul in moving excavated material from cut to fill on Pennsylvania highway; dumping excavated material through 120-ft. chute across double-track railroad line; built on 33-deg. slope; 7×3 1/2-ft. box.
Chute handles 52,000 Cu. Yd. of fill across railroad tracks
Eng. News-Rec
Engineering News Record ; 100 , n 19
1928
2 pages
3 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
52,000-ton D.W. tanker British lancer
Engineering Index Backfile | 1963
Railroad fill across swamp confined by steel sheeting
Engineering Index Backfile | 1931
|Engineering Index Backfile | 1950
|Engineering Index Backfile | 1949
|Engineering Index Backfile | 1928
|